Commercial Projects
   Netto Flint

Our client PJ Spillings was tasked with delivering a rapid build of this outlet for the Netto supermarket chain.

We pre-fabricated and assembled the infill panels off site. They were delivered and erected to close in the building allowing the internal works to start. The brick slips were then applied on site.

...............................................................................................................................
   Sainsbury's Hoddesdon

Main contractor Clancy Docwra had to meet time constraints on delivering a car park extension whilst ensuring the finish matched the original.

We manufactured off site steel frame panels clad externally with brick slip and internally with render matching the existing walling.

...............................................................................................................................
   Refurbishment - Mezzanine Floors

Tristar Homes wanted to increase the capacity of their industrial unit maximising cost efficiencies and minimising disruption

Using EWALL we constructed two mezzanine floors and a dividing wall without any modification to the existing slab. The bay sizes were set to meet the client's operational needs and a secure security store incorporated into the design.

...............................................................................................................................
   Industrial Units

To house their joinery and glazing facilities Tristar Homes required temporary but functional stand alone buildings

Using EWALL to build the structure we clad the building using an acrylic coating and roof coating and then internally dry lined them giving them outstanding durability over the intended life cycle.

...............................................................................................................................
   Infill Panels - Education sector

Pre-fabricated infill panels are a rapid, clean and safe solution when constructing in this sector whether this be new build, extensions or refurbishments.

At Pelton School in Durham light steel frame panels with insulated render were used for an extension to the sports facilities.